Available for ImportTurbine Upgrade Kit for T-100/120-130-2 - Optimizing Steam Turbine Performance
Manufacturer:UK TES LLC
Price:Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
Kit for technical re-equipment of steam turbine T-100/120-130-2 is designed for its modernisation with replacement of high-temperature units and parts that have exhausted their resource. Composition of the Kit: a new CVD complete, CVD stator flange and rotor with highly efficient blade profiles and developed overband seals, CVD seals (front, rear and diaphragm seals), Front Bearing Block complete, including. support liner, GMN and servo-motor VD, complete with foundation frame, support liner, control valves, stop valve block, VDC camshaft distributor, turbine cladding, set of pipelines for installation of the supplied equipment, as well as diaphragms of the 20th, 21st, 22nd and 23rd stages of DDC, ND servomotor, regulating diaphragms of the 24th and 26th stages of DDC, sets of working blades of the 24th and 26th stages of DDC to replace the corresponding units and parts of SD and ND having a high degree of wear
Specifications
Minimum scope of modernization
Technical re-equipment of T-100/110-120 series turbine: life-saving units and parts operating at temperature more than 450C are replaced, which allows to renew the resource of the whole turbine, as well as to increase technical and economic indicators of t
Average volume of modernization
In addition to replacing life cycle components and parts of the high-pressure cylinder, additionally includes replacing worn out elements of the medium-pressure flow part, thereby improving the reliability of the medium-pressure part.
Maximum scope of modernization
In addition to the medium option, the worn elements of the low-pressure flow part are replaced to increase the reliability of the low-pressure part.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
Special Check Valve KOS-400-1M2.5 for Turbine Protection
View DetailsSteam Turbine Diaphragm 21 Stages 36T230-2820
View DetailsHigh-Pressure Cylinder Assembly for PT-135 Turbine with Valves
View DetailsSemi-Flexible Coupling with Fastening PС.100.201.05.000
View DetailsRigid Coupling with Fasteners for Steam Turbines PS.100.201.06.000
View DetailsDiaphragm 22 Stages 48T230-3276 for Steam Turbine Separation
View DetailsSpecial Check Valve KOS 150-1M10 for Turbine Protection
View DetailsFront sealing for turbine shaft CND KЭ16.138.02.000
View DetailsSpecial Check Valve KOS 150-2M10 for Turbine Protection
View DetailsDiaphragm Sleeve PS.100.125.02.000
View DetailsSteam Turbine Coupling PS 200.1411580
View DetailsFront Bearing PS.100.313.00.000 - Turbine Support Bearing
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions