The SB cell is designed for:
- formation of RESET, START signals, activity transfer signals (AST1, AST2) for the neighbouring cell of another SB half-cell;
- formation of FERK signals (46.1 kHz) and transmission to the cells of the control centre when the CEPK signal is used to enable the EPC by the CP board;
- formation of requests (INTC A, B) to the CP cell for signature data output (DA, DB) from the CP cell;
- hardware control of the data DA, DB.
Tell us what you need and get quotes from verified suppliers