Available for Import
High-Pressure Turbine Cylinder Assembly T-250 for Enhanced Efficiency
Manufacturer:
UTZ OJSC
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
The project of modernisation of turbine T-250/300-2400 provides for replacement of units and parts of the turbine operating at high temperatures and exhausted resource, and includes replacement of:
-WDC and CSD-I complete with installation on the existing foundation and new front bearing block and thrust bearing housings;
-Blocks of valves VD and SD with actuators with double steam inlets for connection to steam lines of boiler drum TPP-210A;
-block of the front bearing, support bearing assembly and rear support liner CSD-I;
-foundation frames under the housings of the front bearing block and thrust bearing;
-equipment of the turbine with electrohydromechanical ATS and turbine protection;
-equipping the drive turbine of the PTH with an electromechanical system of automatic regulation and protection with replacement of the actuators of the stop and control valves
equipping the turbine with ASKVM;
-replacement of ejectors, EOCs, oil protection rings and turbine cladding.
Designation of the turbine after Modernisation: T-250/300-23,5 PR1.
-WDC and CSD-I complete with installation on the existing foundation and new front bearing block and thrust bearing housings;
-Blocks of valves VD and SD with actuators with double steam inlets for connection to steam lines of boiler drum TPP-210A;
-block of the front bearing, support bearing assembly and rear support liner CSD-I;
-foundation frames under the housings of the front bearing block and thrust bearing;
-equipment of the turbine with electrohydromechanical ATS and turbine protection;
-equipping the drive turbine of the PTH with an electromechanical system of automatic regulation and protection with replacement of the actuators of the stop and control valves
equipping the turbine with ASKVM;
-replacement of ejectors, EOCs, oil protection rings and turbine cladding.
Designation of the turbine after Modernisation: T-250/300-23,5 PR1.
Specifications
Maximum scope of modernization
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Average volume of modernization
In addition to the replacement of high-pressure and medium-pressure cylinder resource units and parts; additionally includes the replacement of low-pressure flow section; and by-pass tubes from high-pressure cylinder to medium-pressure cylinder.
Minimum scope of modernization
Modernisation of T-250 series turbine replace service life units and parts; operating at temperatures above 450°C. This allows to renew the service life; and also to increase the nominal; maximum power and heat load in condensing mode.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
Diaphragm for Steam Turbine Cylinder Separation 47T230-3216
View DetailsGuide Ring PS200.1517298
View DetailsSteam Turbine Modernization Kit T-100
View DetailsSteam Turbine Upgrade Parts K-210-130-3M4 for Primorskaya GRES Block No. 5
View DetailsTurbine Upgrade Kit for T-100/120-130-2 Model
View DetailsHigh-Pressure Cylinder with Valve Block for K-800-23.5-5MR Turbine
View DetailsLow-Pressure Cylinder Rotor for K-100 Turbine
View DetailsHigh-Pressure Turbine Cylinder Assembly with Control Valves
View DetailsFront sealing for turbine shaft CND KЭ16.138.02.000
View DetailsSemi-Flexible Coupling with Fastening PС.100.201.05.000
View DetailsSteam Turbine Diaphragm 21 Stages 36T230-2820
View DetailsGuide Ring for Steam Flow Division PS200.1513691
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions