Available for ImportHigh-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade Applications
Manufacturer:UTZ OJSC
Price:Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
The project of modernisation of turbine T-100-130 provides for replacement of units and parts of the turbine operating at high temperatures and exhausted resource, and includes types of works - replacement of:
- complete DDC and CSD with installation on the existing foundation and new housings of the front bearing block and middle (thrust bearing) bearing
- control and locking valves
- cam-type distributor of the UA control valves
- CND flow section
- control diaphragm servomotor
- foundation frames under the housings of the front bearing block and the centre (thrust) bearing block
- two safety valves on the lower heating extraction pipeline for one safety valve
- organisation of additional steam extraction behind the CVD from the bypass pipe of the CVD-CSD to the general station collector with a flow rate of up to 70 t/h.
Designation of the turbine after Modernisation: T-110/120-12,8 PR2.
- complete DDC and CSD with installation on the existing foundation and new housings of the front bearing block and middle (thrust bearing) bearing
- control and locking valves
- cam-type distributor of the UA control valves
- CND flow section
- control diaphragm servomotor
- foundation frames under the housings of the front bearing block and the centre (thrust) bearing block
- two safety valves on the lower heating extraction pipeline for one safety valve
- organisation of additional steam extraction behind the CVD from the bypass pipe of the CVD-CSD to the general station collector with a flow rate of up to 70 t/h.
Designation of the turbine after Modernisation: T-110/120-12,8 PR2.
Specifications
Minimum scope of modernization
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Average volume of modernization
In addition to the replacement of high-pressure and medium-pressure cylinder resource units and parts; additionally includes the replacement of low-pressure flow section; and by-pass tubes from high-pressure cylinder to medium-pressure cylinder.
Maximum scope of modernization
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
Turbine Diaphragm 24 Stages 47T230-3216
View DetailsDiaphragm for Steam Turbine Cylinder Separation 47T230-3218
View DetailsComplete Upgrade Kit for CND K-210(215)-12.8 Turbine Block
View DetailsMedium Pressure Cylinder (CSD) with Valve Block SD for K-800-23.5-5MR Steam Turbine
View DetailsSteam Turbine Diaphragm Stage 29 47T230-3218
View DetailsDiaphragm for Steam Turbine Cylinder Separation 48T230-3279
View DetailsSteam Turbine Upgrade Kit K-215-130-1M3 for CND Block #9
View DetailsSteam Turbine Diaphragm 26 Stages 36T230-2821
View DetailsTurbine Support Bearings PS.100.304.01.000
View DetailsDiaphragm for Steam Turbine Cylinder Separation 47T230-3216
View DetailsSteam Turbine Diaphragm 30 Stages Model 47T230-3219
View DetailsMedium Pressure Cylinder (CSD) with Valve Block for K-330-23.5-6MR Steam Turbine
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions