The unit is designed to control the operation of the RKP-M complex units, to collect and primary processing of information about the control object, to exchange information with higher-level subsystems within the automated system of train traffic control at the station and the system of automated dispatch control
أخبرنا بما تحتاجه واحصل على عروض أسعار من موردين موثوقين