Gas turbine plant GTES-2,5 is designed to produce and supply heat and electricity to industrial and domestic consumers. GTES-2,5 is also in demand at oil and gas production facilities as the main or backup source of electricity and heat.The gas turbine engine D049R (PJSC "ODK-Saturn") with a capacity of 2.5 MW is used as a drive. The project of the block automated gas turbine unit GTES-2.5 was developed jointly with the Power Plant Design Centre of JSC ROSEP (Moscow).
The use of the presented gas turbine unit is favourable due to its high efficiency. The high CIT of the unit ensures a quick payback period.
The power plant is made in the form of block-transportable modules in full factory readiness. The composition of the delivery set of GTES-2.5 may vary depending on the design and as a result of continuous work to improve the technical appearance of the units. In addition to the standard equipment set, a wide range of optional equipment is available to meet the customer's requirements for installation and operation.
In 2011 GTPP-2.5 was recognised as the best according to the results of the All-Russian contest "100 Best Goods of Russia".
أخبرنا بما تحتاجه واحصل على عروض أسعار من موردين موثوقين