1
وصف الطلب
2
معلومات الاتصال

ماذا تحتاج؟

صف المنتج أو الخدمة التي تبحث عنها

معلومات الاتصال

سنتواصل معك في أقرب وقت ممكن

تم إرسال طلبك!

شكرًا لك! سنتواصل معك قريبًا مع أفضل العروض.

مجموعة تحديث لكتلة التوربين CND K-210(215)-12.8

مجموعة تحديث لكتلة التوربين CND K-210(215)-12.8

$90,000 - $360,000 USD
MOQ: 1 sets

الميزات الرئيسية

Rated power: 210
Maximum steam flow rate through CND: 480
Nominal temperature of fresh steam upstream of CVD stop valves: 540 مليون م³
Absolute pressure in the condenser: 0.037

الوصف

CND modernisation kit K-210(215)-12,8 is a flow part of low pressure cylinder (LPC) of steam turbine K-210-130-3M3, which converts potential energy of steam into mechanical work and is intended for generator drive. The set consists of the following main parts: - stator parts of the flow part; - one-piece forged low-pressure rotor (LPR) supported on two sliding bearings.

High performance and reliability of the steam turbine are ensured by: - aerodynamic experimental tests of blades, confirming their reliability and efficiency;- smooth meridial contours of the flowing part;- new improved designs of seals;- introduction of modern progressive methods of designing and technologies and equipment. Their serviceability is guaranteed for more than 40 years and inter-repair period is not less than 6 years.

منتجات ذات صلة

High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

مجموعة ترقية الأسطوانة ذات الضغط العالي لتوربين بخار T-100

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
Steam Turbine Upgrade Kit K-215-130-1M3 for CND Block #9

مجموعة ترقية التوربين البخاري K-215-130-1M3 لكتلة CND رقم 9

$90,000-$360,000 USD
Maximum steam flow rate through CND: 480
Nominal temperature of fresh steam upstream of CVD stop valves: 540
ش.م سيلوفي ماشيني 🇷🇺
Turbine Upgrade Kit for T-100/120-130-2 Model

مجموعة تحديث التوربين T-100/120-130-2

$300,000-$1,800,000 USD
Minimum scope of modernization: Technical re-equipment of T-100/110-120 series turbine: life-saving units and parts operating at temperature more than 450C are replaced, which allows to renew the resource of the whole turbine, as well as to increase technical and economic indicators of t
Average volume of modernization: In addition to replacing life cycle components and parts of the high-pressure cylinder, additionally includes replacing worn out elements of the medium-pressure flow part, thereby improving the reliability of the medium-pressure part.
ش.ذ.م.م القابضة تبلوإنيرغوسيرفيس 🇷🇺
Steam Turbine Modernization Kit T-100

مجموعة تحديث التوربين البخاري T-100

$60,000-$600,000 USD
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

مجموعة أسطوانة التوربين عالي الضغط لترقية T-100-130

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine

مجموعة ترقية أسطوانة الضغط العالي لتوربين البخار PT-60

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
Steam Turbine Diaphragm 30 Stages Model 47T230-3219

غشاء توربين بخاري مكون من 30 مرحلة موديل 47T230-3219

$9,000-$30,000 USD
Overall dimensions (diameter): 2950
Overall dimensions (width): 420
ش.ذ.م.م القابضة تبلوإنيرغوسيرفيس 🇷🇺
Modular Vise PQ160 with Amplifier and Step Jaws Set BB.VS.160.11.002

فكي مودولار PQ160 مع مكبر ومجموعة من الشفاه المتدرجة BB.VS.160.11.002

$150-$420 USD
Jaw width: 160
Workpiece clamping force: 54000
ش.ذ.م.م أرموريكا 🇷🇺
Graphite Electrodes EGSP-UNP Diameter 520 mm and More 650 mm

أقطاب الجرافيت من نوع EGSP-UNP بقطر يصل إلى 520 مم وأكثر من 650 مم

$900-$3,000 USD
Diameter: 710
Length: 1500
ش.ذ.م.م إل 6 🇷🇺
Fountain Armature for Well Sealing (AFK)

أرماتور نافورة (AFK)

$9,000-$60,000 USD
Working pressure: 14...105
Material: alloy steel, corrosion-resistant alloy
ش.م أك كورفيت 🇷🇺
T-60/66-10.2 Steam Turbine - Single-Cylinder Design

توربينة البخار T-60/66-10.2 - تصميم أسطوانة واحدة

$900,000-$3,000,000 USD
Rated power: 66
Maximum heat load: 143
ش.م أورال 🇷🇺
Carbon Electrodes for Ferroalloy Production, Packaged, Size 762x914x3556

أقطاب كربونية لإنتاج الفيروأليوي - عبوة بحجم 762x914x3556

$90-$300 USD
Thermal conductivity, W/m*K: 80
Thermal conductivity, W/m*K: 80
ش.ذ.م.م إل 6 🇷🇺
Spot Welding Machine for Low Carbon Steel MT-801 UHL4

آلة لحام النقاط للصلب منخفض الكربون MT-801 UHL4

$900-$3,000 USD
Power: 60
Rated welding current: 8500
ش.م مصنع "فيرما سيلما 🇷🇺
Steam Turbine P-50-12.8/0.8

توربين بخاري P-50-12.8/0.8

$90,000-$360,000 USD
Fresh steam consumption: 330
Fresh steam pressure: 12.8
ش.م أورال 🇷🇺
Polishing Motor POLIR 6.4 OPTIMUM

آلة تلميع بولير 6.4 أوبتيموم

$900-$3,000 USD
Weight: 14
Power supply (without external hood): 220/230
ش.ذ.م.م فيغا - برو 🇷🇺
Carbon Mono-Electrodes 1205 mm for Ferrothermal Furnaces MUV-C

الأقطاب الكهربائية الكربونية أحادية 1205 ملم للاستخدام في الأفران الحرارية MUV-C

$900-$3,000 USD
Diameter: 1205
Ash content: 2.5
ش.ذ.م.م إل 6 🇷🇺
Stator Section Kit for Electric Motor A-114-4 (320kW, 6000V, 1480 RPM) RESIN Technology

مجموعة أقسام القلب الثابت للمحرك الكهربائي A-114-4 (قوة 320 كيلو واط، جهد 6000 فولت، سرعة 1480 دورة في الدقيقة)

$900-$3,600 USD
Section length: 900
Section width: 319
ش.ذ.م.م رإم إند كويل 🇷🇺
Wellhead Equipment Type ANK for Sealing and Control

معدات رأس البئر من نوع ANK للتسرب والتحكم

$3,000-$18,000 USD
Working pressure: 70
nominal passage: 150
ش.ذ.م.م مصنع المعدات النفطية والغازية "تخنوفيك 🇷🇺
Stator Section Set for Electric Motor FVEZ909714

مجموعة أقسام الستاتور لمحرك كهربائي FVEZ909714

$3,000-$18,000 USD
Section length: 1700
Section width: 262
ش.ذ.م.م رإم إند كويل 🇷🇺
Stator Winding Section Kit for Electric Motor 6A355M4

مجموعة أقسام لفائف الجزء الثابت لمحرك كهربائي 6A355M4

$900-$3,000 USD
Section length: 945
Section width: 270
ش.ذ.م.م رإم إند كويل 🇷🇺
طلب عبر واتساب