المنتجات — الأتمتة الصناعية

GPI Signal Control Panel with 2 Buttons - Model KR-21C

لوحة التحكم بإشارات GPI مع زرين - نموذج KR-21C

SAR 337.50-1,125
ش.ذ.م.م ليس-تف 🇷🇺
Passive GPI Signal Control Panel KR-21 with 2 Buttons

لوحة تحكم إشارات GPI السلبية KR-21 مع زرين

SAR 112.50-360
ش.ذ.م.م ليس-تف 🇷🇺
GPI Signal Control Panel with 3 Buttons - Model KR-31C

لوحة التحكم بإشارات GPI مع 3 أزرار - طراز KR-31C

SAR 337.50-1,125
ش.ذ.م.م ليس-تف 🇷🇺
GPI Signal Control Panel KR-11 - Passive Control with Locking Button

لوحة التحكم بالإشارات GPI KR-11 - تحكم سلبي بزر قفل

SAR 56.25-180
ش.ذ.م.م ليس-تف 🇷🇺
GPI Control Remote with 10 Channels - KR-101C

جهاز التحكم GPI مع 10 قنوات - KR-101C

SAR 562.50-2,025
ش.ذ.م.م ليس-تف 🇷🇺
KR Series Control Panels for External Device Management

لوحات التحكم من سلسلة KR

SAR 337.50-1,125
ش.ذ.م.م ليس-تف 🇷🇺
Control Panel AC3-3 for Matrix Switchers

لوحة التحكم AC3-3 لمبدلات المصفوفة

SAR 562.50-1,800
ش.ذ.م.م ليس-تف 🇷🇺
2-in-1 Relay Switch for HD/SD-SDI and CVBS Video - SW-21VAS2-REL

مفتاح التبديل الثنائي 2 في 1 للفيديو HD/SD-SDI وCVBS - SW-21VAS2-REL

SAR 562.50-1,800
ش.ذ.م.م ليس-تف 🇷🇺
Active Control Panel KR-21C-K with GPI Signals and PC Control

لوحة تحكم نشطة KR-21C-K مع إشارات GPI

SAR 337.50-1,125
ش.ذ.م.م ليس-تف 🇷🇺
Active Control Panel KR-51C-K1P2 with GPI Signals

لوحة التحكم النشطة KR-51C-K1P2 مع إشارات GPI

SAR 1,687.50-6,750
ش.ذ.م.م ليس-تف 🇷🇺

انشر طلب الشراء الخاص بك

احصل على عروض من موردين موثوقين

وفر وقتك
Active Control Panel KR-21C-K2 with GPI Signals

لوحة التحكم النشطة KR-21C-K2 مع إشارات GPI

SAR 562.50-1,800
ش.ذ.م.م ليس-تف 🇷🇺

الأسئلة الشائعة

•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.