المنتجات — الأتمتة الصناعية

Compact BASIS-14 Control and Protection Controller

جهاز التحكم والحماية BASIS-14 المدمج

SAR 1,687.50-6,750
ش.م إيكوريسورس 🇷🇺
BASIS-100 Modular Industrial Controller for Emergency Protection

جهاز التحكم الصناعي المودولي للحماية الطارئة بزايس-100

SAR 33,750-225,000
ش.م إيكوريسورس 🇷🇺
Multichannel Industrial Controller with Alarm Protection - BAZIS-21

وحدة تحكم صناعية متعددة القنوات مع نظام إنذار - بازيس-21

SAR 3,375-13,500
ش.م إيكوريسورس 🇷🇺
Compact Multi-channel Technological Regulator-Controller BAZIS-RHYTHM

منظم-قارئ تكنولوجي متعدد القنوات باسي-ريثيم

SAR 337.50-1,350
ش.م إيكوريسورس 🇷🇺

الأسئلة الشائعة

Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.