المنتجات — الأتمتة الصناعية

M18-4 Communication Device Connection Module

وحدة اتصال الأجهزة التواصلية M18-4

SAR 33.75-135
ش.م نبو أفورا 🇷🇺
Marine Vessel Technical Control System "Zaliv

نظام التحكم الفني البحري "زاليي

SAR 22,500-225,000
ش.م نبو أفورا 🇷🇺
Central Control Panel 1

لوحة التحكم المركزية 1

SAR 33,750-135,000
ش.م نبو أفورا 🇷🇺
Local Control Panel 1 (LPU1)

لوحة التحكم المحلية 1 (LPU1)

SAR 5,625-18,000
ش.م نبو أفورا 🇷🇺
Pressure Relay KRD-1 - Pressure Control Switch

رلي ضغط كRD-1 - مفتاح تحكم ضغط

SAR 337.50-1,350
ش.م نبو أفورا 🇷🇺
M18 and M18-1 Communication Devices for Discrete Signal Output

أجهزة الاتصال M18 و M18-1 لإخراج الإشارات المنفصلة

SAR 33.75-135
ش.م نبو أفورا 🇷🇺
Central Control Panel 3 - Model CC-3

لوحة التحكم المركزية 3 - نموذج CC-3

SAR 33,750-112,500
ش.م نبو أفورا 🇷🇺

الأسئلة الشائعة

•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.