المنتجات — السلامة المرورية والطرق

Emergency Light Signaling Post PASO2

عمود الإشارة الضوئية الطارئة PASO2

SAR 56.25-180
ش.م فيلان 🇷🇺
PASV2 Emergency Signal Light Post for Hazardous Areas

عمود إشارة الطوارئ PASV2

SAR 337.50-1,125
ش.م فيلان 🇷🇺
Industrial Sound Alarm Post PSO-C "Siren

بوست إنذار صوتي صناعي PSO-C "صفارة

SAR 56.25-180
ش.م فيلان 🇷🇺
Industrial Sound Alarm Post PSO-Z "Bell

بوست إنذار صوتي صناعي PSO-Z "جرس

SAR 67.50-225
ش.م فيلان 🇷🇺
PASV5 Light Signal Post for Emergency and Warning Signaling

عمود إشارة ضوئية PASV5

SAR 337.50-1,125
ش.م فيلان 🇷🇺
Industrial Sound and Light Alarm Signal Post PASO1-G "Horn

برج إشارة الصوت والضوء الصناعي PASO1-G "قرن

SAR 337.50-1,125
ش.م فيلان 🇷🇺
Industrial Sound and Light Alarm Signal Post PASO1-Z "Bell

بوست إنذار صوتي وضوئي صناعي PASO1-Z "جرس

SAR 112.50-360
ش.م فيلان 🇷🇺
Emergency Sound Alarm Post PSV-G "Horn

بوست إنذار صوتي طراز PSV-G "قرن

SAR 112.50-450
ش.م فيلان 🇷🇺
PASV7 Light Signal Post for Emergency Alerts

عمود إشارة ضوئية PASV7

SAR 337.50-1,125
ش.م فيلان 🇷🇺

الأسئلة الشائعة

Can traffic signal systems be configured to our national standards?
Largely yes. Lens diameters (200/300 mm), signal phases, pedestrian modules with countdown timers and audible signals are configurable, and controllers support custom phase programs. Send your national signal standard or a reference photo of existing intersections; manufacturers will confirm what matches off the shelf and what needs adaptation.
Do speed enforcement cameras integrate with our back-office and vehicle databases?
Enforcement units capture violations with timestamps, coordinates and plate recognition, then export evidence packages via standard data formats. Integration with your national fine-processing system requires an API project — suppliers provide protocol documentation and have done such integrations in several countries. Discuss plate-format recognition for your region explicitly; it is a software configuration item.
Are solar-powered options available for sites without grid connection?
Yes — solar configurations exist for pedestrian crossing beacons, variable message signs, delineators and some signal installations. Suppliers size panels and batteries to your latitude and required autonomy days. For African and Middle Eastern solar conditions, autonomy sizing is usually generous; specify dust exposure so the right panel maintenance recommendations come with the kit.
What is the typical delivery picture for a corridor project?
Manufacturing for a multi-intersection package typically takes 45–60 days after specification freeze. Heavy items — poles, barriers, bollards — move by sea from Novorossiysk (4–7 weeks to most destinations) or by truck within reach of Central Asia (1–3 weeks). Electronics can be air-freighted separately if your installation schedule is staged.
What documentation supports public tender requirements?
Suppliers furnish conformity declarations, photometric test data for signal heads and retroreflective materials, IP and temperature ratings, controller programming manuals and as-built wiring drawings. For tenders requiring manufacturer authorization letters, factories issue them per project. Crash-tested items come with test reports; review the test standard cited against what your tender requires.