المنتجات — السلامة المرورية والطرق

Light Signal Post with IP56 Rating, 24V - Model SS-24-L2P

عمود إشارة ضوئية بتصنيف IP56، 24 فولت - نموذج SS-24-L2P

SAR 33.75-135
ش.ذ.م.م ن.ب.ف "م.ر.س إلكترونيكس 🇷🇺
Light Signal Post SS-220-L1 for Safety Notifications

عمود إشارة ضوئية SS-220-L1 للإشعارات الأمنية

SAR 33.75-135
ش.ذ.م.م ن.ب.ف "م.ر.س إلكترونيكس 🇷🇺
Light and Sound Alarm Post SS-24-C1

عمود إنذار ضوئي وصوتي SS-24-C1

SAR 56.25-180
ش.ذ.م.م ن.ب.ف "م.ر.س إلكترونيكس 🇷🇺
5-Signal Light and Sound Column SS-24-SK5M

عمود ضوء وصوت بـ 5 إشارات SS-24-SK5M

SAR 562.50-2,025
ش.ذ.م.م ن.ب.ف "م.ر.س إلكترونيكس 🇷🇺
Sound Alarm Post SS-220-C3 for Industrial Safety

جهاز إنذار صوتي SS-220-C3 للسلامة الصناعية

SAR 56.25-180
ش.ذ.م.م ن.ب.ف "م.ر.س إلكترونيكس 🇷🇺

الأسئلة الشائعة

Can traffic signal systems be configured to our national standards?
Largely yes. Lens diameters (200/300 mm), signal phases, pedestrian modules with countdown timers and audible signals are configurable, and controllers support custom phase programs. Send your national signal standard or a reference photo of existing intersections; manufacturers will confirm what matches off the shelf and what needs adaptation.
Do speed enforcement cameras integrate with our back-office and vehicle databases?
Enforcement units capture violations with timestamps, coordinates and plate recognition, then export evidence packages via standard data formats. Integration with your national fine-processing system requires an API project — suppliers provide protocol documentation and have done such integrations in several countries. Discuss plate-format recognition for your region explicitly; it is a software configuration item.
Are solar-powered options available for sites without grid connection?
Yes — solar configurations exist for pedestrian crossing beacons, variable message signs, delineators and some signal installations. Suppliers size panels and batteries to your latitude and required autonomy days. For African and Middle Eastern solar conditions, autonomy sizing is usually generous; specify dust exposure so the right panel maintenance recommendations come with the kit.
What is the typical delivery picture for a corridor project?
Manufacturing for a multi-intersection package typically takes 45–60 days after specification freeze. Heavy items — poles, barriers, bollards — move by sea from Novorossiysk (4–7 weeks to most destinations) or by truck within reach of Central Asia (1–3 weeks). Electronics can be air-freighted separately if your installation schedule is staged.
What documentation supports public tender requirements?
Suppliers furnish conformity declarations, photometric test data for signal heads and retroreflective materials, IP and temperature ratings, controller programming manuals and as-built wiring drawings. For tenders requiring manufacturer authorization letters, factories issue them per project. Crash-tested items come with test reports; review the test standard cited against what your tender requires.