المنتجات — معدات البناء الثقيلة

D20.0101 Bulldozer with YAMZ Engines for Heavy Operations

جرافة D20.0101 مع محركات YAMZ للأعمال الثقيلة

SAR 337,500-1,125,000
ش.ذ.م.م س.د.م 🇷🇺
D20.0100 Bulldozer with YMZ Engine - Heavy-Duty Construction Machinery

جرافة D20.0100 بمحرك YMZ - آلة بناء ثقيلة

SAR 337,500-1,125,000
ش.ذ.م.م س.د.م 🇷🇺
D15.0100 Bulldozer with YAMZ Engine Configuration for Heavy-Duty Applications

جرافة D15.0100 مع تكوين محركات YAMZ للأعمال الثقيلة

SAR 337,500-1,125,000
ش.ذ.م.م س.د.م 🇷🇺
D12.1002 Bulldozer with YAMZ Engines for Heavy-Duty Applications

بلدوزر D12.1002 مزود بمحركات يامز لأغراض ثقيلة

SAR 337,500-1,125,000
ش.ذ.م.م س.د.م 🇷🇺
D12.1001 Bulldozer with YAMZ Engines for Heavy-Duty Operations

جرافة D12.1001 مزودة بمحركات YAMZ لأعمال ثقيلة

SAR 337,500-1,125,000
ش.ذ.م.م س.د.م 🇷🇺
D9.0100 Bulldozer with YAMZ Engines for Heavy-Duty Operations

بلدوزر D9.0100 بمحركات يامز لأعمال الثقيلة

SAR 337,500-1,125,000
ش.ذ.م.م س.د.م 🇷🇺

الأسئلة الشائعة

How do I get spare parts after the machine arrives?
Agree a recommended spares kit with the factory at purchase — typically filters, wear plates, hoses and undercarriage items sized for 1,000–2,000 motohours. Afterwards, parts ship by air or groupage freight against the machine serial number. Many buyers keep a 5–10 percent of machine value in parts stock, which covers the first two seasons.
Are these machines adapted for hot and dusty climates?
Yes, tropical versions are standard order options: upgraded cooling packages, pre-cleaners and cyclone air filters, and cabin air conditioning. Russian machines already tolerate wide temperature ranges by design, but state your ambient maximum and altitude in the request so the plant fits the correct radiator and fan configuration.
What does shipping a bulldozer or roller actually cost and how is it done?
Smaller rollers and compactors travel in open-top or flat-rack containers; bulldozers and pavers usually go RoRo from Novorossiysk or St. Petersburg, sometimes partially disassembled with the blade and cab shipped separately. Sea freight to the Gulf or East Africa typically takes 25–45 days. Suppliers prepare the machine for marine transport, including preservation and lashing points.
Is operator training or commissioning support included?
Commissioning supervision is normally a paid option: a factory engineer attends startup, verifies assembly and trains your operators over 3–7 days. For simpler machines, plants provide English-language manuals, video instructions and remote support instead. Write the support package into the contract rather than assuming it.
What payment terms do machinery plants accept?
The common pattern is an advance of 30–50 percent with the balance before shipment, paid by bank transfer. Letters of credit are accepted by larger plants, though confirming banks should be discussed early given current banking routes. For repeat buyers, partial deferral against delivery documents is sometimes negotiable.
Do cementing units and treatment plants come with engineering support?
Yes. Oilfield cementing units and packaged wastewater plants are engineered products, so suppliers provide process calculations, foundation and utility connection drawings, and supervised commissioning. For treatment plants, you submit inflow volume and contamination data first; the plant then sizes the unit and guarantees outlet parameters in the contract.