المنتجات — معدات البناء الثقيلة

DR-15.02 Bulldozer with Hydrostatic Transmission and Ripper Attachment

جرافة DR-15.02 بنظام نقل الحركة الهيدروليكي وملحق الخدش

SAR 337,500-1,125,000
ش.ذ.م.م مصنع تش.ز.ب.ت 🇷🇺
DR-12.01 Bulldozer with Hydrostatic Transmission

بلدوزر DR-12.01 مع نظام نقل حركة هيدروليكي

SAR 337,500-1,125,000
ش.ذ.م.م مصنع تش.ز.ب.ت 🇷🇺
DR-10MT.01 Bulldozer with Mechanical Transmission & Towbar

جرافة DR-10MT.01 بناقل حركة ميكانيكي وجهاز سحب

SAR 337,500-1,125,000
ش.ذ.م.م مصنع تش.ز.ب.ت 🇷🇺
Bulldozer with Direct-Action Blade for Heavy-Duty Operations B10PM.8120DZ

بلدوزر بشفرة مباشرة للعمل الشاق B10PM.8120DZ

SAR 225,000-675,000
ش.ذ.م.م مصنع تش.ز.ب.ت 🇷🇺
Hydraulic Tilt Dozer with Swivel Blade B10PM.8100DR

بلدوزر مع شفرة دوارة مع انحراف هيدروليكي B10PM.8100DR

SAR 180,000-562,500
ش.ذ.م.م مصنع تش.ز.ب.ت 🇷🇺
Bulldozer with Semi-Spherical Blade for Waste Management B10PM.8100-1E1

جرار Bulldozer مع شفرة نصف كروية لإدارة النفايات B10PM.8100-1E1

SAR 225,000-675,000
ش.ذ.م.م مصنع تش.ز.ب.ت 🇷🇺
Bulldozer with Semi-Spherical Blade and Hydraulic Tilt B10PM.8100ER

بلدوزر بشفرة نصف كروية مع ميل هيدروليكي B10PM.8100ER

SAR 337,500-1,125,000
ش.ذ.م.م مصنع تش.ز.ب.ت 🇷🇺

الأسئلة الشائعة

How do I get spare parts after the machine arrives?
Agree a recommended spares kit with the factory at purchase — typically filters, wear plates, hoses and undercarriage items sized for 1,000–2,000 motohours. Afterwards, parts ship by air or groupage freight against the machine serial number. Many buyers keep a 5–10 percent of machine value in parts stock, which covers the first two seasons.
Are these machines adapted for hot and dusty climates?
Yes, tropical versions are standard order options: upgraded cooling packages, pre-cleaners and cyclone air filters, and cabin air conditioning. Russian machines already tolerate wide temperature ranges by design, but state your ambient maximum and altitude in the request so the plant fits the correct radiator and fan configuration.
What does shipping a bulldozer or roller actually cost and how is it done?
Smaller rollers and compactors travel in open-top or flat-rack containers; bulldozers and pavers usually go RoRo from Novorossiysk or St. Petersburg, sometimes partially disassembled with the blade and cab shipped separately. Sea freight to the Gulf or East Africa typically takes 25–45 days. Suppliers prepare the machine for marine transport, including preservation and lashing points.
Is operator training or commissioning support included?
Commissioning supervision is normally a paid option: a factory engineer attends startup, verifies assembly and trains your operators over 3–7 days. For simpler machines, plants provide English-language manuals, video instructions and remote support instead. Write the support package into the contract rather than assuming it.
What payment terms do machinery plants accept?
The common pattern is an advance of 30–50 percent with the balance before shipment, paid by bank transfer. Letters of credit are accepted by larger plants, though confirming banks should be discussed early given current banking routes. For repeat buyers, partial deferral against delivery documents is sometimes negotiable.
Do cementing units and treatment plants come with engineering support?
Yes. Oilfield cementing units and packaged wastewater plants are engineered products, so suppliers provide process calculations, foundation and utility connection drawings, and supervised commissioning. For treatment plants, you submit inflow volume and contamination data first; the plant then sizes the unit and guarantees outlet parameters in the contract.