المنتجات — أثاث الأماكن العامة

Two-Section Lounge Chair for Waiting Areas

كرسي انتظاري ذو قسمين

SAR 562.50-2,025
ش.ذ.م.م كورونا 🇷🇺
Two-Section Reclining Chair

كرسي قابل للتعديل ذو قسمين

SAR 562.50-1,800
ش.ذ.م.م كورونا 🇷🇺
Theater Chair Model "Florence

كرسي مسرحي موديل "فلورنسا

SAR 562.50-1,800
ش.ذ.م.م كورونا 🇷🇺
3-Section Reclining Chair Model "FIT 3M

كرسي قابل للتعديل 3 أقسام موديل "فيت 3م

SAR 337.50-1,125
ش.ذ.م.م كورونا 🇷🇺
4-Section Chair for Comfort and Versatility

كرسي 4 أقسام للراحة والمرونة

SAR 337.50-1,125
ش.ذ.م.م كورونا 🇷🇺
Metal Frame Chair for Comfortable Seating

كرسي بإطار معدني للجلوس المريح

SAR 337.50-1,350
ش.ذ.م.م كورونا 🇷🇺
Theatre Chair for Auditoriums - Model TC-953

كرسي مسرحي للمسارح - الطراز TC-953

SAR 562.50-2,025
ش.ذ.م.م كورونا 🇷🇺
Theater Seating Chair Model "FIT 0020

كرسي مسرح موديل "فيت 0020

SAR 337.50-1,125
ش.ذ.م.م كورونا 🇷🇺
Auditorium Seating Chair for Theatres and Halls

كرسي للأماكن العامة

SAR 337.50-1,350
ش.ذ.م.م كورونا 🇷🇺
Auditorium Concert Hall Chair Model ABC-123

كرسي قاعة الحفلات النموذج ABC-123

SAR 562.50-2,025
ش.ذ.م.م كورونا 🇷🇺
Theater Seat Model "FIT 0020

كرسي مسرحي موديل "فيت 0020

SAR 337.50-1,125
ش.ذ.م.م كورونا 🇷🇺
Retro Theater Seat - Comfortable Seating Solution

كرسي مسرح ريترو - حل مريح للجلوس

SAR 337.50-1,125
ش.ذ.م.م كورونا 🇷🇺

انشر طلب الشراء الخاص بك

احصل على عروض من موردين موثوقين

وفر وقتك
Conference Room Chair Model "Yukon Luxe Conference

كرسي قاعة المؤتمرات نموذج "يوكون لوكس للمؤتمرات

SAR 562.50-2,025
ش.ذ.م.م كورونا 🇷🇺

الأسئلة الشائعة

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.