المنتجات — أثاث الأماكن العامة

Outdoor Trash Bin for Parks and Dog Areas

سلة مهملات خارجية للحدائق ومناطق الكلاب

SAR 337.50-1,125
ش.ذ.م.م ليم-ستيل 🇷🇺
Outdoor Bench for Landscape Design LG1047

مقعد خارجي لتصميم المناظر الطبيعية LG1047

SAR 562.50-1,800
ش.ذ.م.م ليم-ستيل 🇷🇺
Park Waste Bin for Separate Waste Collection LG1040

سلة نفايات للحدائق LG1040

SAR 1,687.50-5,625
ش.ذ.م.م ليم-ستيل 🇷🇺
Outdoor Trash Bin with Galvanized Steel Frame LG1058

سلة قمامة خارجية مع إطار فولاذي مجلفن LG1058

SAR 337.50-1,125
ش.ذ.م.م ليم-ستيل 🇷🇺
Park Bin LG1057 - Durable Outdoor Waste Container

سلة قمامة حدائق LG1057 - حاوية نفايات خارجية متينة

SAR 337.50-1,125
ش.ذ.م.م ليم-ستيل 🇷🇺
Park Waste Bin with Galvanized Steel Frame LG1038

سلة المهملات في الحديقة LG1038

SAR 787.50-2,250
ش.ذ.م.م ليم-ستيل 🇷🇺
Outdoor Trash Bin LG1059

سلة نفايات خارجية LG1059

SAR 337.50-1,125
ش.ذ.م.م ليم-ستيل 🇷🇺
Park Trash Bin LG1036

سلة المهملات الحديقة LG1036

SAR 562.50-1,800
ش.ذ.م.م ليم-ستيل 🇷🇺
Park Trash Bin LG1037

سلة مهملات حديقة LG1037

SAR 337.50-1,125
ش.ذ.م.م ليم-ستيل 🇷🇺

الأسئلة الشائعة

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.