المنتجات — أثاث الأماكن العامة

Two-Section Metal Cabinet (ШМ3)

خزانة معدنية ذات قسمين (ШМ3)

SAR 101.25-270
ش.ذ.م.م ميتميبل الأثاث 🇷🇺
Single-section Metal Cabinet (Model SHM1)

خزانة معدنية أحادية القسم (الموديل ش م 1)

SAR 78.75-225
ش.ذ.م.م ميتميبل الأثاث 🇷🇺
Tabletop Tribune (TRL87) - Compact and Stylish Design

منصة طاولة (TRL87) - تصميم مدمج وأنيق

SAR 56.25-180
ش.ذ.م.م ميتميبل الأثاث 🇷🇺
Daily Reporting Station for Company (MDN3-4, P. 120)

مكان تقرير يومي للسرية (مدن3-4، ص. 120)

SAR 562.50-1,575
ش.ذ.م.م ميتميبل الأثاث 🇷🇺
Universal Storage Cabinet for Military Personnel and Personal Items (SHL44)

خزانة تخزين عالمية للأغراض الشخصية والمعدات العسكرية (SHL44)

SAR 562.50-1,575
ش.ذ.م.م ميتميبل الأثاث 🇷🇺
Day Room Workstation for Battalion (MDN3-4, p.333)

مكان يومي للسرية (MDN3-4، ص.333)

SAR 1,350-4,125
ش.ذ.م.م ميتميبل الأثاث 🇷🇺

الأسئلة الشائعة

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.