المنتجات — أثاث الأماكن العامة

Magazine Storage Unit with 10 Cells

وحدة تخزين المجلات بـ 10 خلايا

SAR 337.50-1,125
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
15-Cell Magazine Storage Unit with Display Functionality

وحدة تخزين المجلات بـ 15 خلية

SAR 562.50-1,575
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Periodical Publications Storage Unit

وحدة تخزين المنشورات الدورية

SAR 337.50-1,350
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Modular Storage Unit with 18 Compartments, 2-Module Design

وحدة تخزين مودولار مع 18 حجرة، تصميم ذو وحدتين

SAR 562.50-1,800
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Rotating Magazine Rack with 20 Compartments

حامل مجلات دوار بـ 20 حجرة

SAR 3,375-11,250
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Display Podium Stand for Exhibits and Seating

منصة عرض للمعارض والمقاعد

SAR 337.50-2,250
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Vertical Display Showcase Type EO

واجهة عرض عمودية من النوع EO

SAR 1,575-11,250
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Museum Exhibit Showcase for Posters and Embroideries 1772x2440x790 mm

واجهة عرض المتحف للملصقات والتطريزات 1772x2440 مم

SAR 3,375-11,250
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Customizable Information Stand with LED Lighting Options

حامل معلومات قابل للتخصيص مع خيارات إضاءة LED

SAR 67.50-675
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺
Horizontal Display Showcase Type EO

عرض عمودي أفقي من نوع EO

SAR 1,687.50-11,250
ش.ذ.م.م ن.ب.ب دوغر 🇷🇺

الأسئلة الشائعة

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.