المنتجات — أثاث الأماكن العامة

Magazine Storage Cabinet (45 pcs) 800x370x2000mm Model 405.115

خزانة تخزين المجلات (45 قطعة) 800x370x2000 مم موديل 405.115

SAR 562.50-1,575
ش.ذ.م.م مصنع الأثاث كومود 🇷🇺
Demonstration Desk B1 900x4000x500-1200x650-1250mm

مكتب عرض B1 900x4000x500-1200x650-1250مم

SAR 787.50-3,150
ش.ذ.م.م مصنع الأثاث كومود 🇷🇺
One-Sided Library Shelf 600x280x1910mm - Metal Frame

رف مكتبة أحادي الجانب 600x280x1910 مم - إطار معدني

SAR 112.50-360
ش.ذ.م.م مصنع الأثاث كومود 🇷🇺
Demonstration Library Shelf 900x280x1910mm

رف مكتبة عرضي 900x280x1910ملم

SAR 270-825
ش.ذ.م.م مصنع الأثاث كومود 🇷🇺
Library Shelf 800 - Customizable Design and Colors

رف مكتبة 800 - تصميم قابل للتخصيص

SAR 337.50-4,500
ش.ذ.م.م مصنع الأثاث كومود 🇷🇺
Corner Library Shelf 500x500x1910mm (WxDxH)

رف مكتبة زاوية 500x500x1910 مم (عرضxعمقxارتفاع)

SAR 157.50-562.50
ش.ذ.م.م مصنع الأثاث كومود 🇷🇺

الأسئلة الشائعة

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.