المنتجات — أثاث الأماكن العامة

Mini Bench - Polymer Sand Composite

مقعد ميني - مركب رمل بوليمري

SAR 112.50-675
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Round Polymer-Sand Composite Bench with Backrest on Metal Frame

مقعد دائري مع هيكل معدني

SAR 787.50-2,250
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Corner Bench with Metal Frame

مقعد زاوي مع هيكل معدني

SAR 562.50-2,025
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Polymer Sand Composite Changing Room Cabin with Metal Frame

كابينة تغيير مصنوعة من مركب الرمل البوليمري مع إطار معدني

SAR 337.50-1,125
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Straight Bench Without Backrest - Polymer Sand Composite on Metal Frame

مقعد مستقيم بدون مسند

SAR 337.50-1,125
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Classic 2m Bench with Polymer Sand Composite

مقعد كلاسيك 2 متر من مركب الرمل البوليمري

SAR 337.50-1,125
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Wave Bench - Parametric Polymer Sand Composite

مقعد موجة - مركب رمل البوليمر

SAR 787.50-2,700
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Changing Room Cabin with Metal Frame

كابينة تغيير ملابس بإطار معدني

SAR 787.50-2,250
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺
Dressing Cabin with Legs for Concrete, Metal Frame

كابينة تغيير الملابس مع أرجل للتثبيت في الخرسانة، إطار معدني

SAR 562.50-1,800
ش.ذ.م.م تشيستايا بلانيتا 🇷🇺

الأسئلة الشائعة

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.